ASKAP TOO Observation Request Form
This form is intended to capture requests for time-critical observations triggered by circumstances that demand a prompt response. This specifically refers to observations including:
  • Science-motivated requests, of a modest scale with a Target-of-Opportunity nature
  • Observations to commission, test or demonstrate new ASKAP capabilities or modes
If your request is not specifically time-critical, then it should be submitted as a Guest Science Project proposal via the ATNF process: 
 
See also the guidelines for non-SSP requests:

Requests for time should be submitted via this form and should generally be for no more than 100 hours.

Requests will be assessed on merit by the ASKAP Summit committee in consultation with the relevant Survey Science Team PIs, with an expected response time of within 2 weeks. Highly time-critical requests will be assessed immediately by the Project Scientist and Head of ASKAP Science Operations with further consultation deferred to the next possible time.

When determining specification, please refer to the ASKAP Observation Guide:
https://confluence.csiro.au/display/askapsst/ASKAP+Observation+Guide

For any questions, please contact Vanessa Moss: vanessa.moss@csiro.au
Sign in to Google to save your progress. Learn more
Email *
Name of primary contact: *
Email of primary contact: *
Note: this should be the email of the person who will be contacted regarding this request (which may be different to the person submitting the form). 
Which category does this request fall under? *
Required
Which (if any) existing ASKAP Survey Science Project/s is this request aligned with? *
Required
Name of source/s: *
For multiple sources, please include a line-separated list. For more complex source-specification requirements, please make a note of this in the "any other relevant information" section. 
Coordinates of source/s (J2000): *
Sexagesimal preferred e.g. 20:34:17.142, -60:19:18.17. For multiple sources, please include a line-separated list.
Minimum integration time required (hr): *
Please outline how the total required integration time will be distributed in the technical description section. 
Minimum array requirements: *
Be specific e.g. all antennas, all long baselines, > 2 antennas, etc
True sky frequency (MHz): *
Note: if central frequency doesn't matter, just put N/A in the field below.
Footprint: *
Pitch: *
Rotation (target field): *
Note: for the majority of science cases, this is equal to -45. A different number should only be put if known to be necessary.
Correlator mode: *
If zoom, provide more details in technical description about what kind of zoom mode is required.
Spectral resolution: *
Interleaved: *
Beamforming interval: *
Default is 1 MHz intervals. Must be an odd number! Do not change unless necessary.
Brief justification of the observations being requested: *
This justification should cover either the science-motivated or commissioning-motivated nature of the request, and be commensurate in level of detail with the amount of time being requested. 

Observations should also fit into the scope as outlined by the non-SSP survey request guidelines:
https://www.atnf.csiro.au/projects/askap/ASKAP_non-survey_requests.pdf 

In the case of commissioning/test/demonstration observations, please also briefly address:
  • Science, commissioning or strategic value of the proposed new capability or mode
  • Significance of the specific proposed tests for commissioning or demonstration
  • Any impact on other ASKAP activities or resources
  • Any potential conflict with the science goals of any existing ASKAP program
  • Any intention to publish scientific results using the proposed observations
Justifications should be no more than 2500 characters. 
Brief technical description and requirements of the observations being requested: *
This should include any requirements for special processing, Pawsey disk space, staff assistance or other resources. Descriptions and requirements should be no more than 2500 characters. 
Are these observations time-critical? Please justify why and explain timing boundaries. *
Please outline your data release plan for science or commissioning data products associated with this request: *
Refer to the latest ASKAP Publication Policy for more information: https://confluence.csiro.au/display/askapsst/ASKAP+Publication+Guide
Any other relevant information?
A copy of your responses will be emailed to the address you provided.
Submit
Clear form
Never submit passwords through Google Forms.
reCAPTCHA
This content is neither created nor endorsed by Google. Report Abuse - Terms of Service - Privacy Policy