JavaScript isn't enabled in your browser, so this file can't be opened. Enable and reload.
218 OSCM SE – IL - OSCM - 02 Productivity Management
MBA SEM-II 2021-22 Online Exam
S. P. Mandali's
Prin. N.G.Naralkar Institute of Career Development & Research
536 Shaniwar Peth, Appa Balwant Chowk (ABC Chowk) Pune-411030
* Indicates required question
Email
*
Your email
Student Name
*
Your answer
Roll No
*
Your answer
Class / Division
*
Choose
MBA-I Division A
MBA-I Division B
MBA Specialization
*
Choose
Marketing Management (MKT)
Financial Management (FIN)
Human Resources Management (HRM)
Operations and Supply chain Management (OSCM)
Business Analytics (BA)
Rural & Agri -Business Management (RABM)
Subject
*
Choose
218 OSCM SE – IL - OSCM - 02 Productivity Management
MBA SEM-II 2021-22 Online Exam
Total Questions : 25
Per Questions Mark : 1
Passing Mark : 10
The prime object of Industrial Engineering is to
Increase the productivity by eliminating waste
Non-value adding operations
Improving the effective utilization of resources
All of the above
Clear selection
Following is not a productivity measurement models
Craig and Harris model
Taylor – Davis model
APC model
PPC model
Clear selection
In outline process chart, the horizontal lines represent
general flow of process
materials being introduced
both ‘a’ and ‘b’
production process
Clear selection
The following factor(s) must be considered while selecting the work for method study
Economic considerations
Technical considerations
Human reactions
All of the above
Clear selection
Work study consists of
Effective use of plant and equipment
Effective use of human effort
Evaluation of human work
All of the above
Clear selection
JIT stands for
Just in Technology
Just Introduced Technology
Just in Time
Job in Ton
Clear selection
Which one is NOT an index of Productivity?
Man-hour output
Productivity ratio
TQM
Use of Financial Ratios
Clear selection
The best way of improving the productivity of capital is:
Purchase automatic machines
Effective Labour control
To use good financial management
Productivity of capital is to be increased through effective materials management.
Clear selection
Improvement in productivity can be done through the
Crashing
Value Analysis
Product design
Work measurement
Clear selection
A _______-Index is a device of expressing the ratio between outputs and the inputs of the resources numerically
Product
Production
Product design
Productivity Index
Clear selection
Method study should _- work measurement.
Precede
Parallel
Serial
Simultaneous
Clear selection
Increased productivity leads to cost _____
Retained
Reduction.
Increase
No Effect
Clear selection
_______- in productivity leads to retrenchment of work force.
Increase
Reduction.
Maintain
No Effect
Clear selection
The most widely used index of productivity is to work out the output per machinehour.
Production
Product design
Productivity
Product
Clear selection
Productivity =
Input / Output
Output / Input
Output – Input
Output X Input
Clear selection
The resources utilized for production are
Materials, Machines, Manpower
Materials, Methods, Machines
Machines, Manpower, Methods
Methods, Machine, Manpower
Clear selection
Productivity =
1+ (Profit/Cost)
1+ (Cost /Profit)
1- (Profit/Cost)
1- (Cost /Profit)
Clear selection
Raw material productivity can be increased by
Proper choice of design
Reuse of material
Scrap control
All of the above
Clear selection
Preventive maintenance improves
Material productivity
Labour productivity
Machine productivity
Capital productivity
Clear selection
The time for which the worker or machine or both remain idle due to the shortcomings of the management or workers is known as
Excess time
Idle time
Ineffective time
Work content
Clear selection
The elimination of which of the following will improve industrial productivity
Excess time
Ineffective time
Work content
Both (A) and (B)
Clear selection
Which of the following adds idle time due to short runs?
Excessive product variety
Lack of Standardization
Design Changes
Both (A) and (B)
Clear selection
Total work content =
Basic work content + Excess time
Basic work content - Excess time
Basic work content - Ineffective time
Basic work content + Ineffective time
Clear selection
Basic tool in work study is
Graph paper
Process chart
Planning chart
Stop watch
Clear selection
For a product layout the material handling equipment must
Have full flexibility
Employ conveyor belts, trucks, tractors etc.
Be a general purpose type
Be designed as special purpose for a particular application
Clear selection
Submit
Clear form
Never submit passwords through Google Forms.
This content is neither created nor endorsed by Google.
Report Abuse
-
Terms of Service
-
Privacy Policy
Forms