Optimistically aiming for sub 6 to 8 month lead time. For Ergo i, the boards were delivered in around 4-5 months but the PCBs were delayed. This time as long as there aren't any mitigating circumstances we (Gondo + I) forsee that everything will be done within 6 months.
Around a 20-30 MOQ with an intended hard cap of 40. I won't re-run the board as usual ~ (the PCBs are priced at 30 board MOQ)
Fill out the form if you want to join the GB in Jan-Feb 2024.
Gondolindrim is doing the PCBs and will be paid for those directly and separately to the boards.
Board specs/kit contents:
.11 degree typing angle with lightweight design optimised for portability - which is my current preference
.Seamed with dark-age lip
.15.99mm adjusted front height (without bumpons)
.Southpaw FRL layout (Fixed layout in terms of: 7U only bottom row + stepped caps only)
.M4 Screws for case-fastening
.'Cone-feet' styled using custom designed feet made from copper + sandblasted/coated
.Two 'leafspring' top-mounted plates made from 5052 AL material (anodised + sandblasted finish)
.Topcase and Bottomcase made from 6063 AL material (anodised + sandblasted finish)
.Brushed internal copper badge
9.Two sets of 1.6mm thick CEM3 PCB +yes 0.5mm (Unified C5 version) by Gondolind9rim