TSM 218 BCA IIPP TSM QUIZ
Overhead Obstructions and Clearance Limits [08/28/2022 - 09/10/2022]
PLEASE USE YOUR CITY OF LOS ANGELES EMAIL ACCOUNT......DO NOT USE ANY OTHER EMAIL HERE
* Indicates required question
CHECK BELOW FOR THE CORRECT CITY ID NUMBER
PAYSRID
*
Your answer
CORRECT FORMAT FOR NAME
First_Name
*
Your answer
Last_Name
*
Your answer
Class Code
*
Choose
ASST INSPECTOR I
ASST INSPECTOR II
ASST INSPECTOR III
ASST INSPECTOR IV
CONSTRUCTION INSPECTOR
OPERATG ENGRS IU-GRP I
SR CONSTRUCTION INSPECTOR
SR ELECTRICAL INSPECTOR
PR CONSTRUCTION INSPECTOR
CH CONSTRUCTION INSPECTOR
CIVIL ENGINEER
OTHER
If Class Code is "OTHER" please specify
Your answer
DIVISION
*
Choose
100
200
300
400
500
600
700
800
900
District
*
Choose
District 1 & 6
District 2
District 3 & 5
District 4
District 7 & 9 & 10
District 8
A1
A2
A3
A4
W1
W2
W3
POLA
LAWA
PA
MTL CTRL
TRAINING
EXEC
OCC
OWS
ADMIN
OTHER
Supervisor
*
Choose
Emmanuel Achonu
Bill Benson
Johnny Brewer
John Calderon
Jim Cassley
Tom Dam
Ken Hendricks
Michael Howard
Victor Karayan
David Miles
Peter Rhyu
Gilbert Zermeno
Roosevelt Bagby
George Espindola
Angela Martinez
Brett McReynolds
Seffy Wiles
Kimberly Fitzpatrick
Lynda McGlinchey
Angelica Samayoa
Raoul Mendoza
John Reamer, Jr.
1.
Which of the following agencies requires the general public, contractors and builders to be notified of work near overhead power lines in Los Angeles?
*
1 point
Cal-OSHA
City of Los Angeles Building and Safety
Bureau of Contract Administration
LADWP
LAWA
Board of Public Works
2.
LADWP plan OA006-01 reference only restricts work that will take place with a 10 foot radius of the high voltage lines?
*
1 point
True
False
3.
The best and safest method to protect equipment, workers, adjacent structures and the public from hazards associated with working around high voltage lines is which of the following?
*
1 point
Barricades
Spotters
Insulated equipment
De-energizing the line
Warning signs
Insulated shields around high voltage lines
4.
If you witness a worker coming in contact with a high voltage line what should you do?
*
1 point
Have the worker stay where they are
Have the worker jump with their feet together
Have the worker shuffle their feet to a distance of 35 feet
Stay clear of the area, call your supervisor and report a fatality.
5.
One of the most recommended way to prevent accidents during a high hazard activity is to do which of the following?
*
1 point
Call Cal-OSHA
Meet with all involved personnel and with anyone at the site that may be affected and discuss the Job Hazard Analysis
BCA inspectors should leave the area when a high hazard operation is being performed
Consult the NIOSH Hierarchy of Controls
Make sure that everyone has the correct PPE
6.
What is the best definition of a JHA?
*
1 point
Tool is used to identify how to perform task step-by-step, any hazards associated with the task and controls to mitigate the hazards.
Report records the details from a potential hazard
Specifies the required practices and procedures necessary to protect employees from fire and explosion hazards associated with hot work
Defiines safe approach boundaries
Outlines procedures that are used to ensure that equipment is shut down and inoperable
7.
What are the two most widely reported causes of lifting failures?
*
1 point
Inadequate training and lack of load scales
Under-rated cranes and defective or incorrect rigging
Inadequate support under outriggers and extending booms beyond a staff angle
Inadequate training and complacency
Improper tag lines and lack of trained spotter
8.
Under High-Voltage Electrical Safety Order §2946. it states that an employer shall not permit any employee to work in the proximity of high voltage lines unless and until danger from accidental contact with said high-voltage lines has been effectively guarded against.
*
1 point
True
False
9.
All BCA inspectors are required to obtain a copy of the contractor's JHA for any work being performed around or under a high voltage power line.
1 point
True
False
Clear selection
10.
The contractors JHA for working around or under a high voltage line should contain references to CSO Article 15. Cranes and Derricks in Construction§ 1612.1. Power Line Safety and include which of the following determinations?
1 point
Identification of worker and equipment on site
Verification of operator certification and equipment maintenance records
Identification of the work zone and whether any equipment or personnel will be within 20 feet from a power line
Identification of potential hazards and the location of the nearest emergency room
Clear selection
11.
Which of the following statements are true regarding hard hats?
*
1 point
BCA policy requires employees to wear their hard hats at all times
A hard hat should only be used when there are hazards present from falling or flying objects
A hard hat is an essential safety PPE that can reduce head injuries or death from falling or flying objects
Per NIOSH Hierarchy of Controls PPE shall be used as a last resort