Cost Deployment Pillar Exam
Sign in to Google to save your progress. Learn more
Email *
Nombre Completo
Empresa
Shall management apply an effective improvement plan addressing major causes of losses with maximum effectiveness, applying the most correct methods with the greatest impact. *
Required
Does CD scientifically and systematically address the main items of loss of the plant production-logistics system? *
Required
HR shall identified losses (losses/processes matrix) *
Required
As a result of the correct CD implementation we shall achive knowledge of the main causes of loss *
Required
Identified total factory cost by deprtment, stablish cost reduction and targets is part of step 1? *
Required
Does step 5 estimates the cost for improvement and the posible cost reduction? *
Required
Depresation and long term lease is excluded from the perimert cost? *
Required
D matrix defines the PDCA for project implementation? *
Required
E matrix tracks project evelution and savings *
Required
F Matrix tracks the project savings (the total project saving in one month) *
Required
G matrix prepares the budget for current year? *
Required
Submit
Clear form
Never submit passwords through Google Forms.
This form was created inside of ALFRA. Report Abuse