Cost Deployment Pillar Exam
Sign in to Google to save your progress. Learn more
Nombre Completo
Empresa
Shall management apply an effective improvement plan addressing major causes of losses with maximum effectiveness, applying the most correct methods with the greatest impact. *
Required
Does CD scientifically and systematically address the main items of loss of the plant production-logistics system? *
Required
HR shall identified losses (losses/processes matrix) *
Required
As a result of the correct CD implementation we shall achive knowledge of the main causes of loss *
Required
Identified total factory cost by deprtment, stablish cost reduction and targets is part of step 1? *
Required
Does step 5 estimates the cost for improvement and the posible cost reduction? *
Required
Depresation and long term lease is excluded from the perimert cost? *
Required
D matrix defines the PDCA for project implementation? *
Required
E matrix tracks project evelution and savings *
Required
F Matrix tracks the project savings (the total project saving in one month) *
Required
G matrix prepares the budget for current year? *
Required