PowerWall 3 Quiz
Sign in to Google to save your progress. Learn more
Email *

Which of the following configurations/parameters are currently available when installing Powerwall 3 systems?

 

Select all that apply, then click 'Submit'

*
1 point
Required

What is the Maximum CAT5 Cable Length that can be run between system components for a wired ethernet connection?

 

Select the correct answer, then click 'Submit'

*
1 point

True or False: Powerwall 3 is not yet compatible with previous generations of Powerwall. 


Select True or False, then click 'Submit'


*
1 point
What is the maximum solar input at STC, for a single Powerwall 3 unit? Select the correct answer, then click 'Submit'
*
1 point

On a Multi-Powerwall 3 installation, at most, how many Site Leader Powerwall 3 units are there?


Choose the correct answer, then select 'Submit'

*
1 point

When Powerwall 3 is installed with the Backup Gateway 2, what device monitors Site? 


Choose correct answer, then select 'Submit'


*
1 point

How do you keep track of the voltage reference in the Gateway?   Select all that apply, then click 'Submit'


*
1 point
Required
True or False: Powerwall 3 systems can currently meter 400A services. 
*
1 point
When utilizing a non-Tesla Powerwall Dolly or standard dolly to transport, the Powerwall 3 must be facing toward the dolly, with connectors protected. Is this image showing the correct orientation of the Powerwall 3 for transport?
*
1 point
Captionless Image

True or False: When commissioning Powerwall 3, you may scan either the QR code located on the side of the Powerwall 3 unit or the QR code located on the black plastic piece below the TACO. 


Choose True or False, then select 'Submit'


*
1 point

What is the minimum number of fasteners that may be used to secure the Powerwall 3 mounting bracket?

 

Select the correct answer, then click 'Submit'

*
1 point

To commission the Powerwall 3, you must access which mobile app?


Choose correct answer, then select 'Submit'

*
1 point
Low amperage is seen on a combined string, without any significant visible shading. Which of the following should be investigated?
*
1 point
Required

What is the measurement from the bottom of the Powerwall 3 to the top row of fasteners on the mounting bracket?

 

Select the correct answer, then click 'Submit'


*
1 point

Jumpers may be installed on the DC terminal block between which of the following MPPTs? 


Select all that apply, then click 'Submit'


*
1 point
Required

Which light color illuminates when the TACO is in a ready state for commissioning? 


Choose the best answer to fill-in the blank, then select 'Submit'

*
1 point
By default, the max frequency shift for Powerwall 3 is set to ______ and the max frequency shift reverts to _______ when AC-coupled.  Choose the responses to fill-in the blanks, then click 'Submit'
*
1 point

When installing a System Shutdown Switch for (2) Powerwalls, what is the correct process?


Select the correct answer, then click 'Submit'


*
1 point

What is the current maximum allowable number of Powerwall 3s that may be installed in a single Powerwall 3 system? 


Choose the correct answer, then select 'Submit'

*
1 point

What option must be selected for metering a system with an AC-coupled inverter?


Choose correct answer, then select 'Submit'

*
1 point

True or False: When wall mounting the Powerwall 3, simply remove the adjustable leveling feet which are intended for ground mount installations.

 

Select True or False, then click 'Submit'


*
1 point

Powerwall 3 LED continuously blinks, not establishing a connection with the Backup Gateway. What are the possible reasons?


Select all that apply, then click 'Submit'

*
1 point
Required
True or False: A System Shutdown Switch may be wired to the RSD ports of either the Powerwall 3 or the Backup Gateway, if available. 
*
1 point

Which of the following knockout sizes are available on the Powerwall 3? 


Select all that apply, then click 'Submit'

*
1 point
Required

When the current for a PV string exceeds the allowable limit, what must be done? 


Select the correct answer, then click 'Submit'


*
1 point

What is the maximum load starting capability of Powerwall 3?

 

Select the correct answer, then click 'Submit'

*
1 point

What size breaker is used when back feeding Powerwall 3? 


Select the correct answer, then click 'Submit'

*
1 point

A customer has a pool pump and a large air conditioning unit. Using the labels provided, how many Powerwall 3 units would be needed to backup these loads. 


Select correct answer, then click 'Submit'

*
1 point
Captionless Image

When commissioning Powerwall 3 with Backup Gateway 2, which device is commissioned, the Powerwall 3 or the Gateway? 


Select the correct answer, then click 'Submit'


*
1 point

What is the default Panel Limits value implemented in the Tesla Site Controller software across all Tesla Powerwall sites?

 

Choose the correct answer, then select 'Submit'

*
1 point

True or False: Ethernet is allowed to be run in the same conduit as PV conductors. 


Select either True or False, then select 'Submit'

*
1 point

When Powerwall 3 is installed with the Backup Switch, what device monitors Site? 


Choose correct answer, then select 'Submit'


*
1 point

Which equipment must be included when installing a Powerwall 3 partial-home backup with loads upstream of the Islanding device?

 

Select all that apply, then click 'Submit'


*
1 point
Required
What is the maximum AC discharge of Powerwall 3?  Select the correct answer, then click 'Submit'
*
1 point
What is the Terminal Configuration for the Communication Wiring inside of Powerwall 3, from left to right? Select correct choice, then click 'Submit'
*
1 point
Captionless Image

The Tesla Asset Controller, also known as TACO, acts as the Site Controller for Powerwall 3 systems.


Onboard the TACO are terminals used for communication with which of the following?  


Select all that apply, then click 'Submit'

*
1 point
Required

How many Neurio meters can be paired with Powerwall 3? 


Choose correct answer, then select 'Submit'

*
1 point
What is the maximum allowable current for each individual MPPT?
*
1 point

Although the minimum clearance between (2) Powerwall 3 units is ______, Tesla's recommended clearance to allow for easier wiring between units is ______.


Choose answers that correctly fill-in the blanks, then click 'Submit'

*
1 point