JavaScript isn't enabled in your browser, so this file can't be opened. Enable and reload.
APC Floodwater Management Plan Meeting 6 24
Thank you for attending the APC Floodwater Management Plan Public Meeting! We want to understand how the six priority actions that the Steering Committee identified during the project align with the priorities of the community at large. We would greatly appreciate it if you could fill out the following form.
A guidance document presents high-medium-low impact rankings as estimated by the Project Team for reference, if helpful. It is accessible by copy/pasting this address into a web browser:
https://drive.google.com/file/d/1mirg1PgMxeeQRV48EGdCwwgkfh6biuc7/view?usp=sharing
Sign in to Google
to save your progress.
Learn more
Please select your top six priorities from the actions related to floodwater level / quality below by placing six checkmarks, one on each of your priorities.
Replace culverts at Snake River and Route 105
Replace railroad bridge over the Nemasket
Install Nemasket silt trap and remove sediment deposition in the first 500ft of the Nemasket
Assawompsett Pond Dam replacement
Elevate Bedford Street
Replace Murdock Street Bridge in Middleboro
Replace Squam Brook Culvert
Work with natural systems / green infrastructure to infiltrate water (e.g. at Ocean Spray and South Coast Rail parking lots)
Remove vegetation mass from Wareham St Pond
Septic system upgrades around the APC
Install permeable reactive barriers to filter nutrients
Coordinate forestry management activities across agencies
Improve forestry management by educating homeowners
Cranberry bog restoration in the watershed
Country drainage along roadways (swales, etc)
Remove sandbards and MassDOT broken drain (495/44)
Install a washing station and educate about invasive transmission
Wetland restoration at Bridge St, Wood St, Wareham St, Vaughn St
Conduct a freshwater mussel survey
Look at existing MOU’s / maintenance plans that exist and improve or renew if necessary
Limit pesticides / herbicides / treatments over and around the APC through Integrated Pest Management and better communication with DPH
Work with legislators and environmental / transportation agencies to review legislation and how it works with proposed pond fixes
Look at a regional O&M plan involving utilities / permits with local water supply Con Comms and BOH's
Develop a long-term, scientifically-based hydro model for the APC and Nemasket to support water supply operations, determine firm yield, and support fish passage
Develop a Management Plan for the APC with best practices for handling the dam, sediment, fisheries, Nemasket flow, floodplain, etc
We'd appreciate any other comments, questions, or feedback that you have on the ideas presented for the APC and Nemasket
Your answer
Submit
Clear form
Never submit passwords through Google Forms.
This content is neither created nor endorsed by Google.
Report Abuse
-
Terms of Service
-
Privacy Policy
Forms