Overflow/Underflow Dam
Skill: 6.6.1.2
Sign in to Google to save your progress. Learn more
Instructions To The Monitor/Evaluator
1. The candidate shall be provided with a ditch or culvert with flowing water through it or simulation.
2. The candidate shall be provided with needed materials for constructing an appropriate dam.
3. The evaluator shall determine which dam will be built by the candidate by identifying the product as heavier than or lighter than water.
4. The candidate shall be given the instructions below before beginning the exercise.
Instructions To The Candidate
Given a spill of an identified product lighter/heavier than water flowing into a culvert or ditch and the proper tools shall successfully perform proper damming procedures.
6 Steps *
Required
Candidate Name: *
Evaluator Name: *
Re-test Evaluator Name:
Submit
Clear form
This content is neither created nor endorsed by Google. Report Abuse - Terms of Service - Privacy Policy