JavaScript isn't enabled in your browser, so this file can't be opened. Enable and reload.
2024 HDOT Harbors Construction and Post-Construction Training Survey
“Mālama i ke awa kai” – Protect Our Harbor Waters
One correct answer per question.
Sign in to Google
to save your progress.
Learn more
* Indicates required question
Email
*
Your email
Date
*
MM
/
DD
/
YYYY
Name (First, Last)
*
Your answer
Company or Office Code (e.g. HAR-EE for Harbors Engineering Branch Environmental Section)
*
Your answer
Job Title:
Your answer
1. NPDES is an abbreviation of:
*
A. National Policy for Discharge of Erosion and Sediment
B. National Pollutant Discharge Elimination System
C. National Pollutant Development and Elimination System
D. None of the above
2. Sediment degrades maritime habitats by:
*
A. Filling in deep pools which give fish protective cover
B. Covering over gravel bottoms used by fish to deposit eggs
C. Blocking light and inhibiting photosysthesis, and abrading coral
D. All of the above.
3. A stabilized construction entrance:
*
A. Is best constructed with 3" to 6" crushed stone
B. Can have geotextile fabric underneath the crushed stone
C. Needs continual maintenance
D. All of the above.
4. Sediment tracked onto roads by construction activity must be cleaned up:
*
A. By the end of the same work day
B. By the end of the next work day if track-out occurs during non-working hours
C. Twice a day.
D. A or B.
5. Nonpoint Source pollutants include:
*
A. Pathogens, Sediment, and Litter
B. Temperature, Sediment, and Groundwater
C. Impervious Surfaces
D. All of the above.
6.
True or False? Clay soils are less permeable than sandy soils.
*
A. True
B. False
7. The purpose of providing erosion and sediment control is to:
*
A. Cause undue hardship and expense on the developer and contractor
B. Provide jobs for government employees
C. Provide a means of construction without harming environment
D. Give environmental activists something to do
8.
Who is responsible for controlling sediment pollution?
*
A. Whoever is the easiest to blame
B. The downstream property owner
C. The owner of the project, the authorized representative, and the general contractor/operator
D. None of the above
9.
True or False? Only extremely high levels of sediment can harm fish in ocean and streams.
*
A. True
B. False
10.
A silt fence needs to be maintained when:
*
A. The sediment reaches one third the height of the fabric
B. The sediment reaches one half the height of the fabric
C. The sediment reaches three quarters the height of the fabric
D. None of the above.
11. How does your job relate to storm water management?
*
Your answer
12. Did you find this Construction and Post-Construction Training relevant and useful? (On a scale of 1 to 5, with 1 for not relevant/useful to 5 extremely relevant/useful) Please select your choice.
*
1
2
3
4
5
13. What was the most interesting part you learned in this training?
Your answer
14. What other topics would you like to see covered in this training?
Your answer
15. Do you have any recommendations on how to improve this Construction and Post-Construction BMP training video?
Your answer
Other comments you may have for this training?
Your answer
MAHALO NUI LOA! Thank you very much!
A copy of your responses will be emailed to the address you provided.
Submit
Clear form
Never submit passwords through Google Forms.
reCAPTCHA
Privacy
Terms
This content is neither created nor endorsed by Google.
Report Abuse
-
Terms of Service
-
Privacy Policy
Forms