Asbury Bond dollars Planning
  • As part of the 2020 bond scope, the Planning and Design Department is working with Asbury and many other schools in the district. The project identifies for each school the type of renovation needed to better the physical environment, address emotional wellbeing and security -- just to name a few. DPS has hired an outside architecture firm to facilitate this process of engaging you and providing the assessment and final reports. Site visits have already occurred for Asbury. Asbury has $100,000 to support areas of need. So what are the areas of need identified? 

    • Staff Lounge

    • Paint in some classrooms

    • Cafeteria

    • Outside area

    • Library

    • Gym (backboards)

    • Based on these areas of need, some of these areas have already started to get a face lift thanks to PTSO, who is already supporting with the staff lounge update

    • In talking to SLT, staff and getting input from parents, we have heard that the following areas are in need of priority updates:

      • Need to have an outdoor lunch areas/learning areas with cool down spaces outdoors

      • Our Cafeteria needs an update with seating

      • Paint is needed in some of our classrooms

      • Some ceiling tiles need replaced

      • Our auditorium needs a new lock to ensure student safety

    • We would love to hear any additional ideas and input from you all about any updates you would like to see. Please give your voice in this survey to ensure your voice is heard!

Log in bij Google om je voortgang op te slaan. Meer informatie
What additional idea do you have to make Asbury a better, safer place for students? *
Any other ideas you would like to share?  *
Verzenden
Formulier wissen
Verzend nooit wachtwoorden via Google Formulieren.
Dit formulier is gemaakt in Denver Public Schools. Misbruik rapporteren