Rodd Field: Yorktown to Adler Public Comment Form

The Project includes a new pavement section to be placed South of Rodd Field Road from Yorktown Boulevard to Adler Drive, which includes new sidewalk, curb ramps, concrete curb, and gutters, signalization at the Yorktown Boulevard intersection, roadside ditches, and various utility improvements.  As part of the Project, three side streets will be tied into the proposed Rodd Field Road (Dunn’s Point Drive, Siberian Steet, & Adler Drive.

The new addition of Rodd Field Road (South of Yorktown intersection) is designated to be a Local Rural Road with 2 lanes and roadside ditches.  The current posted speed limit North of the Yorktown intersection is 45 MPH, this speed limit will be used for the extension of Rodd Field Road.  The new roadway will be striped as a Local-Rural Road and at each intersection.  ADA improvements shall consist of ten (10) foot wide shared use paths, curb ramps, and crosswalk striping.  Traffic and other regulatory signage shall be provided throughout the project limits.  A left-turn lane on Yorktown Boulevard heading Southbound will be needed due to the new traffic movements from Yorktown Boulevard to Rodd Field Road. 

Sign in to Google to save your progress. Learn more
Email *
PROJECT FACTS

Project Consultant Engineer                Hanson

City Project Manager:                           Mai-Theresa Bernal, P. E.

Contractor:                                              Bay LTD.

Construction Inspector:                        Mark Stein (361) 946-5567

Anticipated Construction Start:          August 2023

Anticipated Completion:                      August 2024

Total Project Value:                              $5.1 M 