The Project
includes a new pavement section to be placed South of Rodd Field Road from
Yorktown Boulevard to Adler Drive, which includes new sidewalk, curb ramps,
concrete curb, and gutters, signalization at the Yorktown Boulevard
intersection, roadside ditches, and various utility improvements. As part of the Project, three side streets
will be tied into the proposed Rodd Field Road (Dunn’s Point Drive, Siberian
Steet, & Adler Drive.
The new addition
of Rodd Field Road (South of Yorktown intersection) is designated to be a Local
Rural Road with 2 lanes and roadside ditches.
The current posted speed limit North of the Yorktown intersection is 45
MPH, this speed limit will be used for the extension of Rodd Field Road. The new roadway will be striped as a
Local-Rural Road and at each intersection.
ADA improvements shall consist of ten (10) foot wide shared use paths,
curb ramps, and crosswalk striping.
Traffic and other regulatory signage shall be provided throughout the
project limits. A left-turn lane on
Yorktown Boulevard heading Southbound will be needed due to the new traffic
movements from Yorktown Boulevard to Rodd Field Road.