Junior Beck Drive: Bear Lane to Old Brownsville Road: Public Comment Form
Junior Beck Drive is divided into two street segments.

Segment 1: Junior Beck Drive from Bear Lane to Dead End is classified as a minor residential collector with 0.622 miles in length. This section of street was originally constructed in 1980 and was reconstructed again in 1992. The road consists of a two-lane asphalt roadway with curbs, gutters, and sidewalks that are in poor condition with aging underground utility systems. Junior Beck Drive currently supports industrial and commercial activity with heavy commercial vehicle traffic with only one access point from Bear Lane.

Segment 2: Junior Beck Drive from Dead End to Old Brownsville, is a planned (never built) Minor Residential Collector with 0.321 miles in length.

This project is to construct Segment 1 and Segment 2 simultaneously. This project will reconstruct the existing Junior Beck Drive (Segment 1) with a two-lane roadway, curb & gutter, sidewalks, ADA ramps, pavement markings, signage, utility improvements include upgrades to water, wastewater, storm water, gas and build the new roadway (Segment 2) from the dead end to Old Brownsville Road with a two-lane roadway, safety illumination, cross culverts, and drainage swales on both sides. This project will improve road access and promote further development and growth in the area.  
Sign in to Google to save your progress. Learn more
PROJECT FACTS
Project Consultant Engineer: Urban Engineering
City Project Manager: Mai Bernal
Contractor: Reytec Construction Resources, Inc
Construction Inspector: Geoff Mayer
Award Date: January 11, 2022
Construction Start: February 2022  
Anticipated Completion: May 2023
Total Project Value: $4.9 M