DMAIC-IMROVE & CONTROL (BLACK BELT)
Iniciar sesión en Google para guardar lo que llevas hecho. Más información
Correo *
1. Which of the following statements is TRUE about the IMPROVE phase? *
1 punto
2. The team leader knows that the issue at hand is controversial and might lead to heated discussion among team members. What is the best technique to be used in such situation: *
1 punto
3. The following points are true about Structured brainstorming, except: *
1 punto
4. ___________ is the process of measuring products, services, and processes against those of organizations known to be leaders in one or more aspects. *
1 punto
5. The main output of the “Improve” phase is: *
1 punto
6. In which of the following techniques does it seem logical for someone to offer caution or opinion against a possible solution: *
1 punto
7. Source of information in benchmarking can be the following, except: *
1 punto
8. Which of the following are examples of pilot? *
1 punto
9. If you want to generate a lot of ideas in a short span of time, then the best technique to use is: *
1 punto
10. Which of the following techniques can be used to evaluate potential solutions: *
1 punto
11. Which of the following techniques can be used to generate potential solutions: *
1 punto
12. A family of 4 wants to watch a movie on the weekend and they are unable to reach a consensus on the one they should watch. They decide to do multivoting to know top 3 preferred movies for each family member. Their votes are like this – (A, B, C); (B, C, D); (B, A, E); (B, A, D) Which movie will they watch: *
1 punto
13. Which of the following steps is not a part of the Pilot Plan: *
1 punto
14. The Improve Phase would not include which step: *
1 punto
15. Which of the following is not true about unstructured brainstorming? *
1 punto
16. ____________ is the process of taking solutions from the project and applying it to similar type of processes *
1 punto
17. A process is “stable”. Describe the types of variation that exists in the process. *
1 punto
18. After project wrap-up, management may devise rewards to recognize the work and success of the team. Why is this required? *
1 punto
19. In the case of ________, each observation is plotted as a separate data point. *
1 punto
20. A Control chart can help *
1 punto
21. The ATM pin getting locked after 3 unsuccessful attempts is an example of: *
1 punto
22. The following are TRUE for control plan, except: *
1 punto
23. The following give their sign-off to confirm that the project has met its objectives and is ready for hand-off: *
1 punto
24. What type of variation is undesirable when trying to control a process? *
1 punto
25. What types of variation does a process have if it is "in control"? *
1 punto
26. Which of the following control charts is most appropriate for monitoring the number of defects on different sample sizes? *
1 punto
27. The purpose of using control charts is to determine *
1 punto
28. Which of the following performance measures is most appropriate for evaluating the tangible effects of a six sigma project? *
1 punto
29. Which of the following is the best way to enhance the long-term availability of a machine? *
1 punto
30. A black belt is developing a failure mode and effects analysis (FMEA) for the hamburger preparation station in a fast-food restaurant. The following ratings were developed for the low-heat temperature failure mode. Severity = 9; Occurrence = 2; Detection = 1; What is the risk priority number (RPN) for this FMEA?
1 punto
Borrar selección
31. A system that delivers products or services at the correct time and in the correct quantities is referred to as *
1 punto
32. Poka-yoke is best defined as *
1 punto
33. A company has installed a system that prevents orders with incorrect information from being forwarded to production scheduling. This is an example of which of the following lean tools? *
1 punto
34. Which of the following techniques dramatically shortens changeover times? *
1 punto
35. A store uses signs at specific points in its storage area to indicate when products need to be ordered. This practice is an example of
1 punto
Borrar selección
36. If the number of runs required for a full-factorial experiment is cost-prohibitive, which of the following experiments would have the same number of variables but fewer runs?
1 punto
Borrar selección
37. A six sigma team has been chartered to improve the way in which a company takes orders for its products. Which of the following tools should the team use to determine all of the potential pitfalls and the actual defects that occur?
1 punto
Borrar selección
38. A change agent is responsible for helping the organization do which of the following?
1 punto
Borrar selección
39. Which of the following charts plots the mean of a set of values and recalculates the mean with each new value?
1 punto
Borrar selección
40. Which of the following tools is appropriate to use with multiple criteria requiring a single option to be selected?
1 punto
Borrar selección
41. In comparison to a full-factorial design of experiment (DOE), a traditional, one-at-a-time approach will
1 punto
Borrar selección
42. Which of the following techniques would help increase process stability when the cause of variation is a cluttered work station?
1 punto
Borrar selección
43. Benchmarking is difficult to perform on processes that
1 punto
Borrar selección
Enviar
Borrar formulario
Este contenido no ha sido creado ni aprobado por Google. Denunciar abuso - Términos del Servicio - Política de Privacidad